REFERENCES

Overview of successfully completed hydropower and industrial projects around the world.

OUR SELECTED REFERENCES

New Francis hydropower plant 350 kVA installed in Italy

We have successfully installed and commissioned a new 350 kVA Francis hydropower plant in Italy.
The new water turbine has attracted exceptional attention due to its unique combination of blue and orange colors, which give it both strong recognizability and visual appeal.
Obnova_turbine_hidroelektrarne

Refurbishment of two Francis turbines 2.1 MW and 0.9 MW

We carried out a complete refurbishment of the turbines and rotors, replaced the shafts and bearings, installed new generators and new cooling systems, and renovated the hydraulic units and pre-turbine valves. We supplied and installed a valve with a hydraulic regulator and performed an upgrade and modernization of the overhead crane.
Read more
Double_regulated_Kaplan_vertical siapro

Double-regulated vertical Kaplan hydro turbine for operation in salt water

The vertical double-regulated Kaplan turbine is designed for reliable operation in salt water and is used as a reference installation in Azerbaijan. Made from special corrosion-resistant materials, it ensures long service life. The system includes a 350 kVA synchronous generator and SCADA control. Characteristics: 350 kVA synchronous generator, SCADA automation, head H = 4.4 m, flow rate Q = 8.0 m³/s.
Read more

Vertical Pelton turbine 1.724 kW

A new hydropower plant in Europe uses a vertical Pelton turbine with a rated power of 1,724 kW. The turbine operates with an exceptional head of 324 m and a flow rate of 0.60 m³/s, which enables high efficiency in converting the potential energy of water into electrical energy. The 484 mm runner ensures optimal rotational speed and stable operation of the unit.
Read more

New hydropower plant with a crossflow turbine

A new Siapro hydropower plant is operating in Japan, equipped with a patented flow-control system that increases turbine efficiency by up to 5%. The solution is based on proven Banki (crossflow) technology and delivers higher efficiency, low operating costs, and long service life.

ALL REFERENCES

Small hydropower plant service

We have successfully completed the servicing of our small hydropower plant equipped with two Kaplan turbines. Our expert team performed a comprehensive inspection and maintenance, ensuring flawless operation and optimized efficiency.
Read more

Pelton runner refurbishment

Renovation of the hydropower plant with a Pelton turbine at the Sopotje SHPP in Slovenia. Revitalisation of the old hydroturbine – replacement of the Pelton runner after 33 years of operation with a new CNC-machined runner. The efficiency of the water…
Read more
logo SIAPRO hydro
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Postaja 9
5216 MOST NA SOČI
Slovenija

Subscribe to our newsletter
ChatGPT said: Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group – Vse pravice pridržane