projektiranje kaplan hidroelektrarne

Manufacturing a new Kaplan water turbine for a hydropower plant in Slovenia

Our company has successfully completed the project of manufacturing a brand-new Kaplan water turbine for a customer in Slovenia. The project represents an important step toward increasing the efficiency and reliability of their hydropower plant, while also contributing to the sustainable production of clean energy.

The Kaplan turbine, known for its high efficiency at low heads and variable flow conditions, was designed, manufactured, and fully tailored to the customer’s needs. The entire process – from initial design and material selection to the production of key components, final assembly, and testing – was carried out within our turnkey project model. turnkeyThis means that the customer received a comprehensive, technically refined solution ready for immediate operation.

In addition to the turbine manufacturing itself, we also provided:

  • a complete 3D project design,
  • all hydromechanical equipment,
  • automation and control system,
  • installation and final commissioning,
  • support in operational optimization.

We proudly emphasize that the project further improves the hydropower plant’s energy efficiency and strengthens the long-term stability of renewable energy production in the region.

We design, manufacture, and install hydropower plants up to 10 MW on a turnkey basis.
Contact us!

Other posts

logo SIAPRO hydro
The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Postaja 9
5216 MOST NA SOČI
Slovenija

Subscribe to our newsletter
ChatGPT said: Be among the first to receive updates about our projects, solutions, and news from the SIAPRO Group and the fields in which we operate.
Location
© 2025 SIAPRO Group – Vse pravice pridržane