
Our company has successfully completed the project of manufacturing a brand-new Kaplan water turbine for a customer in Slovenia. The project represents an important step toward increasing the efficiency and reliability of their hydropower plant, while also contributing to the sustainable production of clean energy.
The Kaplan turbine, known for its high efficiency at low heads and variable flow conditions, was designed, manufactured, and fully tailored to the customer’s needs. The entire process – from initial design and material selection to the production of key components, final assembly, and testing – was carried out within our turnkey project model. turnkeyThis means that the customer received a comprehensive, technically refined solution ready for immediate operation.
In addition to the turbine manufacturing itself, we also provided:
We proudly emphasize that the project further improves the hydropower plant’s energy efficiency and strengthens the long-term stability of renewable energy production in the region.
We design, manufacture, and install hydropower plants up to 10 MW on a turnkey basis.
Contact us!

SIAPRO d.o.o.
Postaja 9
5216 MOST NA SOČI
Slovenija